365x24x7
\On Apr 18, 2011, at 7:59 AM, Aaron Wendel wrote:
> My guys work 12 hour shifts. 2 days on, 2 days off, 3 days on, 2 days off, 2 on 3 off. The three days on is always friday-sunday so every other weekend they either have a 3 day weekend or 3 days of work.
>
> In a pay period, with 30 minute lunch per shift it comes to 80.5 hours. I keep my guys on the same shifts for consistancy.
>
> Aaron
My wife is a nurse working second shift, 12-hour shifts, 7p-7a (actually 6:45p to 7:15a to allow for a little overlap). Her hospital has it worked out on a 6-week schedule, with Wednesdays being the new pay week. Nurses there work 3 days a week, for 36 hours.
Here's how they do it (these are calendar weeks)
Week 1 - Su M T F Sa Su
Week 2 - W
Week 3 - M T W
Week 4 - M T F Sa Su
Week 5 - Th
Week 6 - M T
I know this is also a decades-long struggle in the railroad industry too (My business does a lot of contract work with that industry). In particular locomotive engineers and conductors. 100 percent on-call, maximum 12-hours on duty with 10 off (recently changed from 8). Fatigue is quite critical there too, you don't want an engineer falling asleep pulling a train full of HazMat.
For datacenter work, I'd think a schedule like the above would be doable. You end up working every third weekend, and yes, weeks 1 and 4 aren't pleasant, it's followed by a 1-day week so you've got plenty of time to recover.
-Andy
- Follow-Ups:
- 365x24x7
- From: owen at delong.com (Owen DeLong)
- References:
- 365x24x7
- From: jra at baylink.com (Jay Ashworth)
- 365x24x7
- From: dhc2 at dcrocker.net (Dave CROCKER)
- 365x24x7
- From: frnkblk at iname.com (Frank Bulk)
- 365x24x7
- From: smb at cs.columbia.edu (Steven Bellovin)
- 365x24x7
- From: aaron at wholesaleinternet.net (Aaron Wendel)